news-uk
Blackburn to Bolton Railway Reopens Following Tunnel Closure

A vital railway line connecting Blackburn and Bolton has officially reopened following the repair of a damaged tunnel. The Sough Tunnel was temporarily closed after inspectors identified issues with the tunnel wall.
Timeline of Events
On Sunday morning, inspections revealed damages to the tunnel, prompting immediate action from Network Rail. Engineers worked swiftly to address the repairs, leading to the reopening of the tunnel and resumption of train services.
Current Service Status
- The Sough Tunnel is now operational.
- Commuters should check National Rail for updated service information.
- Network Rail is collaborating with train operators to reinstate regular services quickly.
This reopening marks the restoration of an essential transport link for commuters traveling between Blackburn and Bolton. Passengers are encouraged to stay informed about their travel plans during this transition period.




